How often do I need to conduct destructive testing?

News 17-11-2021
How often do I need to conduct destructive testing?

Every time a new prototype is built or a current design has been amended, destructive testing should be completed. If a product passes a destructive test in the past and has had recent modifications, this should be tested again to ensure there are no weaknesses in the new design.

Hyperbaric Chambers

Our facility offers nine hyperbaric testing chambers ranging in size and pressure capability including the world’s largest, commercially available hyperbaric chamber which can simulate water depths down to 4,500 metres.